Skip to main content
Metro Tunnel

Station Precinct Development Plans

Cross Yarra Partnership, the contractor for the Tunnel and Stations package of works, has prepared a draft Development Plan for each of the five new underground stations.

The Development Plans describe the proposed designs for the station entrances and surrounds (to the ticket gates).

The plans demonstrate how the works will be delivered in accordance with the approved Environmental Performance Requirements as defined in the Metro Tunnel Environmental Management Framework (PDF, 1.2 MB), and the approved Urban Design Strategy.

The following plans have been approved by the Minister for Planning.

Development plans

PlansAppendices

Arden Precinct Development Plan (PDF, 973.6 KB)

Appendix A: Site Plan (PDF, 2.4 MB)

Appendix B: Architectural Plans (PDF, 15.5 MB)

Appendix C: Landscape Plans (PDF, 7.3 MB)

Appendix D: Public Realm Plans (PDF, 7.5 MB)

Appendix E: Urban DesignStrategy Assessment (PDF, 177.2 KB)

Appendix F: Environmental Performance Requirements Assessment (PDF, 295.1 KB)

CBD South Precinct Development Plan (PDF, 2.0 MB)

Appendix A: Site Plan (PDF, 4.2 MB)

Appendix B: Architectural Plans (PDF, 14.1 MB)

Appendix C: Landscape Plans  (PDF, 5.7 MB)

Appendix D: Public Realm Plans (PDF, 6.4 MB)

Appendix E: Urban DesignStrategy Assessment (PDF, 269.6 KB)

Appendix F: Environmental Performance Requirements Assessment (PDF, 399.0 KB)

CBD North Precinct Development Plan (PDF, 2.3 MB)

Appendix A: Site Plan (PDF, 3.9 MB)

Appendix B: Architectural Plans (PDF, 21.1 MB)

Appendix C: Landscape Plans (PDF, 26.8 MB)

Appendix D: Public Realm Plans (PDF, 5.7 MB)

Appendix E: Urban Design Strategy Assessment (PDF, 251.5 KB)

Appendix F: Environmental Performance Requirements Assessment (PDF, 380.1 KB)

Domain Precinct Development Plan  (PDF, 2.0 MB)

Appendix A: Site Plan (PDF, 4.9 MB)

Appendix B: Architectural Plans (PDF, 27.7 MB)

Appendix C: Landscape Plans (PDF, 18.6 MB)

Appendix D: Public Realm Plans (PDF, 16.9 MB)

Appendix E: Urban Design Strategy Assessment (PDF, 374.0 KB)

Appendix F: Environmental Performance Requirements Assessment  (PDF, 723.0 KB)

Parkville Precinct Development Plan (PDF, 2.4 MB)

Appendix A: Site Plan (PDF, 4.1 MB)

Appendix B: Architectural Plans (PDF, 23.9 MB)

Appendix C: Landscape Plans (PDF, 6.1 MB)

Appendix D: Public Realm Plans (PDF, 15.1 MB)

Appendix E: Urban Design Strategy Assessment (PDF, 237.0 KB)

Appendix F: Environmental Performance Requirements Assessment  (PDF, 343.3 KB)

Consultation process

Draft Development Plans were available for public display and comment from Monday 27 November to Friday 15 December 2017. In total, 1,507 submissions were received.

As part of the updated Development Plan submission to the Minister for Planning, Cross Yarra Partnership provided all written comments received during the stakeholder and community consultation undertaken in 2017.

Do you need an accessible version of these documents? Please contact us.