Current and planned transport changes

Coronavirus and Victoria’s Big Build

Work is continuing safely on the Metro Tunnel Project as part of Victoria's Big Build. The health and safety of our workforce and community remains our top priority. COVIDsafe Plans are in place on all project sites across Victoria. Learn more.

Building the massive 9km twin rail tunnels and five new underground stations will cause some unavoidable transport disruptions.

Visit the Big Build website to view details of transport disruptions from the other major transport projects currently underway.

View by type

Train line disruptions

For journey planning on public transport visit the Public Transport Victoria website.

DatesLinesDetails
1 February to 30 April Mernda

Buses will replace trains from 8.50pm until the last train service on parts of the Mernda line between 1 February to 30 April 2021.

Temporary night time closures on the Mernda Line

20 to 21 February Sandringham

Buses replace trains on the Sandringham Line between South Yarra and Elsternwick from 1am Saturday 20 February to last train Sunday 21 February. Buses also replace trains from 1:30am to 3am on Sunday 21 February between Elsternwick to Sandringham stations.

Express buses replace trains during the same weekend between Caulfield and Elsternwick stations.

26 February to 3 March

Werribee and Williamstown

Buses replace trains on the Werribee and Williamstown lines between North Melbourne and Newport/Williamstown, including the Altona Loop, and on nights from Wednesday 3 March to Sunday 7 March between North Melbourne and Newport/Williamstown.

26 February to 7 March Sunbury

Buses replace trains between Flagstaff, North Melbourne and Sunbury stations from 9pm Friday 26 February to last train Sunday 7 March.

26 February to 7 March Bendigo

Coaches replace trains from Southern Cross to Gisborne.

Short term disruptions

For road travel advice visit the VicRoads Traffic website.

TimeframeLocationDetails
Parkville Station, Parkville

From late January 2021

Elizabeth Street, Haymarket Roundabout and Pelham street

Lane closures from 7pm to 5am on Wednesday 27 January for up to three weeks on:

  • The Elizabeth Street southbound centre lane from Grattan Street to Haymarket Roundabout,
  • Haymarket roundabout southbound lanes
  • Pelham Street eastbound lane between Haymarket Roundabout and Berkeley Street

Traffic changes in Parkville

Anzac Station, Domain precinct
3 February 2021

St Kilda Road

St Kilda Road southbound will be closed between Dorcas Street and Toorak Road on Wednesday 3 February from 9am to 3pm. A detour will be in place via Dorcas Street and Kings Way.

Traffic changes around Domain

Until March 2021

Peppercorn Lawn, on the southern edge of the Yarra River

Peppercorn Lawn will be occupied for ground improvement works associated with Metro Tunnel construction until March 2021.

Peppercorn Lane work details

State Library Station, Melbourne CBD

From February 2020

La Trobe Street

The eastbound lane on La Trobe Street is temporarily closed during construction hours between Elizabeth and Swanston streets.

La Trobe Street eastbound lane speed limit reduction to 30kph.

The dedicated eastbound bicycle lane and northern footpath on La Trobe Street adjacent to the Metro Tunnel construction site is closed.

Traffic changes around State Library Station

Long term disruptions

Long-term temporary closures are in place near our construction sites. For road travel advice visit the VicRoads Traffic website.

TimeframeLocationDetails
Western tunnel entrance, Kensington

Until 2025

Childers Street

Closed to motorists, with access restricted to residents of Childers and Tennyson streets, construction vehicles, and over-height vehicles for the Lloyd Street Business Estate.

Childers Street closure details

Arden Station, North Melbourne

From late January until late 2023

Laurens Street

Laurens Street will be realigned to support service investigations and relocations, and construction of the Arden Station entrance. This involves the narrowing of traffic and bicycle lanes and closure of sections of footpath and on street parking.

Parkville Station, Parvkille

From 2018

Grattan Street (east)

Closed between Royal Parade/Elizabeth Street and Leicester Street for up to five years.

Grattan Street (east) closure details

From February 2020

Grattan Street (west)

Closed between Flemington Road and Elizabeth Street/Royal Parade.

Grattan Street (west) closure details

State Library Station, Melbourne CBD

From February 2020

Franklin Street

Franklin Street West between Elizabeth and Swanston streets is open to two-way traffic but reduces to one lane width when approaching Swanston Street. Consider blind spot when approaching Swanston Street.

Franklin Street East to remain closed until 2022.

Franklin Street closure details

From January 2017

A'Beckett Street

Closed to road users between Swanston and Stewart streets. Pedestrian access maintained.

A'Beckett Street closure details

Town Hall Station, Melbourne CBD

From September 2019

Flinders Street

The left-hand turn for traffic travelling northbound on St Kilda Road into Flinders Street is closed.

The Flinders Street pedestrian crossing between St Paul’s Cathedral and Federation Square temporarily closed from 3 June 2020 for up to 20 months.

Flinders Street westbound changes

Flinders Street closed eastbound between Swanston and Elizabeth streets for up to three years.

Flinders Street easbound closure details

Anzac Station, Domain precinct

From 2018

St Kilda Road

Reduced to one traffic lane in each direction between Dorcas Street and Toorak Road west

St Kilda Road changes

From 2018

Domain Road

Closed between St Kilda Road and the western edge of Edmund Herring Oval.

Eastern tunnel entrance, South Yarra

From October 2018

William Street Bridge and Lovers Walk

Closed during construction of the eastern tunnel entrance.

William Street Bridge closure details